Steering
Steering
The charts a production steering screen is made of, on made-up figures: the load of each loom group against its capacity, the output against its forecast, and the orders of each item in its table row.
Load against capacity
A bar per group, its capacity as a tick across it. Above 85 % the bar warns, above 100 % it is overloaded: the thresholds are an option.
No data to show.
Actual against forecast
The actual line stops at today; the forecast carries on dashed, inside its confidence band.
No data to show.
A sparkline per row
Six months of orders drawn on the server, the last three highlighted: a table of three thousand rows runs no script for them.
| Item | Orders, 6 months | Average | Available |
|---|---|---|---|
TAP-120-NAT |
54.8 | 62 | |
TAP-160-ANT |
55.7 | 12 | |
TAP-200-SAB |
73.7 | 140 | |
RUN-080-IVO |
66.3 | 8 | |
RUN-080-CHA |
93 | 35 | |
TAP-240-GRE |
105.5 | 0 |